Calcure B & Mastercure

Curing is applied on the slab after the slab has been poured and while still green. Curing slows the drying process of the concrete, reducing the chance of cracking in the slab and stop the slab from shrinking.

Curing is mainly done in the summer period, when the temperature exceeds 30 degrees Celsius. The cure that we use, both Mastercure and Calcure B are non bond breakers which means they will break down in around 90 days and won’t stop the mortar and other adhesives bonding to the concrete.

BASF                                             cementaid

Receive a Free Quote

Send us your details and we'll contact you,
or call us on (08) 6461 5700

  • This field is for validation purposes and should be left unchanged.